WEC conducts the fieldwork and prepares the relevant written text covering Existing Conditions, Impacts, Alternatives Analysis, and Mitigation for federal-level Environmental Impact Statements.
Representative Projects
· Preparation of alternatives analysis for Environmental Impact Statement for gull hazard control program at John F. Kennedy International Airport. This involved analysis of all wildlife hazards at the airport, plus exhaustive research into all possible methods of gull control. For U.S. Department of Agriculture, Animal and Plant Health Inspection Service, through the Louis Berger Group.
· Avifauna study for EIS for the proposed widening of a 13-mile section of U.S. Route 6, Cape Cod, MA. For Massachusetts Highway Department through the Louis Berger Group.
· Avifauna study for EIS for the proposed widening of the Delaware Turnpike. For Delaware Department of Transportation through the Louis Berger Group.
· Avifauna and Endangered species survey for EIS on proposed widening of the NJ Turnpike (including assessments of impacts on wildlife by the project and proposals for mitigating adverse effects on Endangered species and wetlands). For the NJ Turnpike Authority through the Louis Berger Group.
|